Current location: Home > Faculty and Staff > Sort by Position > Lecturer > Content

Lecturer

Lu,Shaojun

Lecturer

Release time: 2021-11-08      clicks:


 

Basic Information

Generated

 

NameLu, Shaojun

 

GenderMale

 

DisciplineE-Business and E-Commerce

 

Professional TitleInstructor

 

E-maillushaojun93@gmail.com

 

 

Personal Introduction

Dr. LU Shaojun is mainly engaged in manufacturing collaborative scheduling optimization for high-end equipment failure and preventive maintenance, high-end equipment manufacturing process optimization, and supply chain manufacturing collaborative optimization in fuzzy scenarios. He has presided over one Youth Project of the National Natural Science Foundation of China, one Anhui Provincial Key Research and Development Program Project and one Youth Project of Anhui Provincial Natural Science Foundation, and participated in three national projects, such as Project of the National Natural Science Foundation of China and Key R&D Program Project of the Ministry of Science and Technology. He has published 11 papers in Applied Soft Computing, Fuzzy Optimization and Decision Making, International Journal of Production Research, and other academic papers at home and abroad. He has been awarded 8 national invention patents and 2 U.S. patents, and co-authored one English monograph, Optimization and Management in Manufacturing Engineering. He has served as a reviewer for international SCI journals, such as Computers & Operations Research, Journal of Global Optimization, and Annals of Operations Research.

 

 

 

Work Experience

Lecturer of Hefei University of Technology, China  for 2 years

 

Education Background

Doctor  Hefei University of Technology    2020
Bachelor  Hefei University of Technology    2015

 

Awards Received

None

 

Intellectual Contribution

Journal Articles

1.Coordinated production and delivery scheduling for service-oriented manufacturing systems with deterioration effect,INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH,2023-05-31

2.Optimal pricing and supply strategy for vertically integrated manufacturers with customer preference and market spillover,COMPUTERS & INDUSTRIAL ENGINEERING,2023-04-30

3.Preemptive multi-skill resource-constrained project scheduling of marine power equipment maintenance tasks1,JOURNAL OF INTELLIGENT & FUZZY SYSTEMS,2023-04-13

4.Modified benders decomposition and metaheuristics for multi-machine parallel-batch scheduling and resource allocation under deterioration effect,COMPUTERS & INDUSTRIAL ENGINEERING,2023-02-28

5.Solving a stochastic hierarchical scheduling problem by VNS-based metaheuristic with locally assisted algorithms ?,APPLIED SOFT COMPUTING,2022-11-30

6.A variable neighborhood search and mixed-integer programming models for a distributed maintenance service network scheduling problem,INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH,2022-11-07

7.Green scheduling of packaging in the global logistics distribution centre with a dominant job and deterioration effects,INTERNATIONAL JOURNAL OF LOGISTICS-RESEARCH AND APPLICATIONS,2022-10-27

8.Review and prospect of artificial intelligence methods for collaborative optimization of high-end equipment manufacturing,Computer Integrated Manufacturing Systems,2022-07-15,28(7):1940-1952

9.The entire life cycle quality management in the new generation of information technology environment,Journal of Management Sciences in China,2022-07-15

10.A variable neighborhood search approach for the resource-constrained multi-project collaborative scheduling problem,APPLIED SOFT COMPUTING,2021-08-01

11.Energy-efficient rescheduling with time-of-use energy cost: Application of variable neighborhood search algorithm,COMPUTERS & INDUSTRIAL ENGINEERING,2021-06-01

12.A hybrid DBH-VNS for high-end equipment production scheduling with machine failures and preventive maintenance activities,JOURNAL OF COMPUTATIONAL AND APPLIED MATHEMATICS,2021-03-01

13.Permutation flowshop manufacturing cell scheduling problems with deteriorating jobs and sequence dependent setup times under dominant machines,OPTIMIZATION LETTERS,2021-03-01

14.Less is more: variable neighborhood search for integrated production and assembly in smart manufacturing,JOURNAL OF SCHEDULING,2020-12-01

15.Robust parallel-batching scheduling with fuzzy deteriorating processing time and variable delivery time in smart manufacturing,FUZZY OPTIMIZATION AND DECISION MAKING,2020-09-01

16.An Intelligent Optimization Method for a Manufacturing System with Multiple Machines Considering Deterioration and Learning Efects,Journal of Systems Science and Mathematical Sciences ,2019-10-15,39(10):1597-1608

17.A hybrid BA-VNS algorithm for coordinated serial-batching scheduling with deteriorating jobs, financial budget, and resource constraint in multiple manufacturers,OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE,2019-01-01

18.A hybrid ABC-TS algorithm for the unrelated parallel-batching machines scheduling problem with deteriorating jobs and maintenance activity,APPLIED SOFT COMPUTING,2018-05-01

19.Single-Machine and Parallel-Machine Parallel-Batching Scheduling Considering Deteriorating Jobs, Various Group, and Time-Dependent Setup Time,INFORMATICA,2018-01-01

20.A hybrid VNS-HS algorithm for a supply chain scheduling problem with deteriorating jobs,INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH,2017-12-27

 

Project

1.Research on cross-stage scheduling optimization issue for chip manufacturing process,2023-04-01,2024-12-31

2.Research on Distributed Device Resource Allocation and Collaborative Scheduling in the Intelligent Manufacturing Environment,2022-01-01,2024-12-31

3.Research on Scheduling System of Manufacturing Process for High-end Storage Chips,2022-01-01,2024-12-31

4.Research on Intelligent Configuration and Collaborative Scheduling of Discrete Manufacturing Resources for High-end Equipment Manufacturing Process,2021-05-01,2023-04-30

5.Research on Collaborative Scheduling of Supply Chain for Equipment Manufacturing Considering Deterioration Effect,2021-04-01,2022-12-31

6.Research on Collaborative Scheduling for the Operation and Maintenance of Equipment Manufacturing for Service-oriented Manufacturing Enterprises,2021-01-01,2022-12-31

 

Patents

1.Method and system for predicting the remaining life of aero-engines,2023-04-14

2.Optimization method and system for dynamic condition-based maintenance strategy considering multitask mode,2022-12-24

3.Method and system for production and maintenance collaborative scheduling based on variable neighborhood search algorithm,2022-12-12

4.Production and maintenance scheduling method based on mixed whale-variable neighborhood search,2022-11-21

5.Multi-objective scheduling method and system for minimizing delivery time and delay of high-end equipment,2022-11-01

6.Multi-project rescheduling method and system for high-end equipment development process considering order insertion,2022-10-28

7.Multi-project collaborative scheduling method and system for high-end equipment R&D process considering constraints for multi-skilled employees ,2022-10-20

8.Collaborative scheduling method and system for production assembly  based on variable neighborhood and genetic operators,2022-10-14

9.Intelligent collaborative scheduling method and system considering controlling workpiece and minimizing energy consumption,2022-10-10

10.Collaborative scheduling method for distributed manufacturing and multimodal transportation of high-end equipment,2022-10-03

11.Production and maintenance scheduling method and system based on improved Grey Wolf Optimization,2022-09-24

12.Robust scheduling method and device for high-end equipment manufacturing based on VNS,The invention,2022-05-24

13.Production scheduling method and system for steel parallel casting machine for high-speed railway axles,The invention,2021-10-26

14.Scheduling method and system for high-end equipment batch machine with improved cuckoo search,The invention,2021-10-08

15.Collaborative scheduling method and system for high-end equipment R&D and manufacturing based on improved EDA,The invention,2021-09-28

16.Data-driven collaborative optimization methods and systems for discrete manufacturing resources,The invention,2021-09-14

17.IoT information processing methods and systems with noise in the supply chain environment,The invention,2021-05-18

18.SCHEDULING METHOD AND SYSTEM BASED ON HYBRID VARIABLE NEIGHBORHOOD SEARCH AND GRAVITATIONAL SEARCH ALGORITHM,International patent,2019-09-03

19.Method and system for scheduling parallel processing machines based on hybrid shuffled frog leaping algorithm and variable neighborhood search algorithm PAR,International patent,2019-09-03

20.Collaborative scheduling method and system for supply chain production and transportation based on improved particle swarm algorithm,The invention,2018-06-15

 

Courses Taught

Operations Research--Undergraduate Teaching